HOW TO CALCULATE
Untuk menyatukan pipa termoplastik dengan benar dan memastikan kualitas penyambungan, operator selalu berkewajiban untuk menemukan tekanan dan waktu yang tepat ketika menyambungkan sesuai dengan standard yang diminta. Anda dapat melakukan konsultasi dengan team kami untuk tabel penyambungan menggunakan mesin AMD butt fusionm atau anda dapat menggunakan perhitungan yang lainnya. Perhitungan kami menggunakan standard ISO 21307:2017 sebagai contoh.
EXAMPLE
Standard: ISO21307:2017 Single Low-pressure
Machine: AMD Butt Fusion Welding Machine SHD 315
Pipe: OD315, SDR17
Step 1
Check below illustration for single low-pressure fusion jointing cycle.
Key
Xtime
Ypressure
P1bead-up pressure
P2heat soak pressure
P3fusion jointing pressure
t1bead-up time
t2heat soak time
t3heater plat removal time
t4time to achieve fusion jointing pressure
t5cooling time in the machine under pressure
t6cooling time out of the machine
Step 2
Check out the formula of the gauge pressure calculation
Where
GPis the gauge pressure (bar);
IPis the interfacial pressure (MPa);
ACis the total effective piston area, given by the manufacturer of butt fusion machine (mm2)
ASis the interfacial surface area (mm2)
DPis the drag pressure
Note: The interfacial pressure is the amount of force per unit of pipe area required to butt fuse the pipe or fitting ends.
Note: The interfacial pressure is the amount of force per unit of pipe area required to butt fuse the pipe or fitting ends.
Step 3
Refer to below tables for phases , parameters and values for single low-pressure fusion jointing procedure
Note:
1.(en + 3) This is the cooling time for the butt joint when still in the machine and under pressure. Cooling time may be shortened and should be lengthened depending on ambient temperature (approximately 1% per 1℃)
2.(d) A cooling time out of the machine and before rough handling maybe recommended.
Step 4
Now using all information and formula above we will calculate all values by maximum
en= dn/ SDR = 315mm / 17 = 18.52 mm
P1= P3 0.19 x {π x (dn-en) x en}÷2000 x 10} + 5 (for example) = 21 bar
P2DP = 5 bar
t1= bead-up size 0.5 + 0.1 x 18.52mm = 2.3 mm
t2(13.5 ± 1.5) x 18.52 = 278 s
t310 s
t43 + 0.03 x 315 = 12.5 s
t50.015 x 18.522- 0.47 x 18.52 + 20 = 16 min
t6d